Glen Canyon Power Plant (Glen Canyon Dam)

This job was contracted by the U.S. Bureau of Reclamation. Contract amount- $192,789.
  • Design/build and installation of two government furnished Trane 250 ton Centravac chillers piped for reversible process to provide heating OR cooling..
  • Includes controls for choice of simultaneous or individual operation.
  • Constructed metal enclosures with refrigerant leak detection and evacuation system.